The Mine

Mongolata Mines

Gold mine data for the Hundred of Mongolata.

Name of Claim/MineAlso Known AsPeriod WorkedOreProduced (In tons & hundredweights)Gold Produced (In troy weight)Value of Gold: N = Normal P = PremiumMethod of WorkingCommentsSection No. in Hundred of Mongloata
Anderson’s Reward19336 t 7 cwt2 oz 5 dwt 3 grN/AOpen cut 15’ x 10’Worked by R. Anderson4E
BaldinaBaldina Mongolata GM Syndicate Mongolata No. 51932-45578 t 16 cwt1,369 oz 18 dwt 15 gr£5,512-0-11 N£6,022- 15-0 P3 main shafts, 30’ 90’, 100’, 2 undelie shafts, main adit 226’Many tributers also worked shallow shafts23M
Better ’Ole19321 t 12 cwt1 oz 13 dwt£5-10-11 N£3-12-1 PN/AAbsorbed into other leasesN/A
Black Hills ClaimsP. Oates ClaimA. Morrison Claim1932-3411 t 5 cwt1 oz 3 dwt 11 gr£4-8-6 NOpen cuts & drivesYields very poor70
Burra Mongolata SyndicateJ. Kellaway & Riggs Claim1931-336 t1 oz 15 dwt£6-18-6 NAdit & several shafts18N
Byles Mongolata GM Co.Mongolata GM SyndicateMain effort 1930-35Minor effort 1945-523,549 t 17 cwt3,938 13 dwt 13 grN/AExtensive, main shaft 341’, main adit at 92’ over 1,000’.Many shafts, drives, adits, crosscuts & stopesDiscovered Henry Byles, worked by Mpngolata GM Syndicate, reformed in 1932 as Byles Mongolata GM Co.36W
Caller BraeTerry’s Mongolata No. 41940As Terry’s or Mongolata No. 4 1 t 10 cwtCaller Brae 64 t 3 cwt6 dwt 13 gr63 oz 0 dwt 21 gr£241-3-7 N£1-11-1 P10’ shaft & aditWorked by R. Anderson36W
Chalk Cliff Gold Prospecting1934N/AN/AN/AN/AN/A
Cunningham & Baillie1933N/AN/AN/AN/AResults unsatisfactory82
Curlew1930-45 & 1950738 t 2 cwt1,817 oz 7 dwt 20 gr£7,424-13-3 N2 long adits, 30’ shaft & many drivesH. Morgan made the claim in 1931, worked by Curlew GM Syndicate.1950 results poor36W& 23N
D. Dillon19341 t 13 cwt3 oz 3dwt 10 grN/AN/AWorked by D. DillonN/A
Donovan, Wills & McConnell1931-32N/AN/AN/AShallow shafts & adits55
The Dope1936-3757 t 1 cwt4 oz 4 dwt 22 grN/AN/AWorked by G. Evans98
Duffer193825 t 16 cwt11 dwt 10 grN/AN/AWorked by G. Evans105
East ViewRampton’s ClaimPart as Wally’s ClaimPart as Lucky Chance(N of Wally’s Hope)1930-4219461955552 t 1 cwt15 t 9 cwtN/A573 oz 12 dwt 6 gr29 oz 17 dwt 8 grN/A┐£2,240-17-1 N┘£2,057-7-5 PN/AOpen cut, adits of 310’ & 67’ & 90’ shaft with drives & underlie shaft1946: Worked by W. Edwards1955: worked by F. Gerlan36W
Feltus’ Claim1933-34N/AN/AN/AShallow pits & open cutAssayed up to 6 dwt/ton55
Fuss’ Claim1931N/AN/AN/AOpen cut & trenchesWorked by A. Fuss91
Gaghen’s Show1935N/AN/AN/ASeveral shafts: deepest 30’, & drivesWorked by C. Gaghen & three others185
R. Garrard1932N/AN/AN/AShallow trenchesWorked by R. Garrard for alluvial, but poor results.25
Golden Eagle193315 t3 oz 9 dwtN/AShaft to 25’ then on underlieWorked by Trenwith & Lunnay: unpayable55
Golden Guinea 193450 t12 oz 18 dwt 13 grN/A50’ shaftWorked by L. & F. Fayers55
Golden HarpAs part of Byles Mongolata GM Co.1930-33From 1933 for several years1 t 3 cwt7 oz 11 dwt 2 gr£29-0-7 N£45-17-0 P308’ adit & drive at 130’John Baker took the claim Dec. 1930: to Golden Harp GM Co. in 1931: unpayable.1933 to Byles Mongolata GM Co. who found payable gold.36W
Golden SpeckNorthern Hope193419363 t 14 cwt5 t 12 cwt3 oz 7 dwt2 oz 5 dwt 9 grN/AN/AShaftsShaftsDept. map shows these as the same.55
Good Hope193428 t3 oz 3 dwt 15 grN/AN/A59 & 60
Hansel & MundyTerry’s ClaimPart reworked as Caller Brae1930-36194062 t51 oz 7dwt 9 grN/A58’ shaft with crosscuts & drivesTaken Dec. 1930 by W. Terry.1931 Hansel Mundy worked an option.1932-36 worked on tribute.1940 see under Caller Brae.36W
King Francis1936-387 t2 oz 5 dwt 5 grN/AShaftWorked by F. Riley for very poor results.36W
KooringaN/A5 t 5 cwt7 dwt 9 gr£1-5-6 NN/AN/A
F. Lewis1931No gold foundN/A42½’ shaft with E & W drivesWorked by F. Lewis36W
Lewis19313 t1 oz 5 dwt 12 grN/AOpen cut & aditWorked by Lewis & party.23S
Mongolata AlluvialMongolata No. 1 Alluvial, see alsoMongolata Central1932-3315 t 18 cwt5 t13 dwt 17 gr2 oz 17 dwt 8 gr£2-0-9 N£11-1-11 NShafts: deepest 187’ with 2 drives & winzeWorked by Mongolata Alluvial GM Co.23N
Mongolata Block 8Flaherty, Bevan & Morgan’s Claim1930-3472 t 12 cwt145 oz 6 dwt 12 gr£572-3-10 NAdits & open cutsDec. 1930 claim of Flaherty, Bevan & Morgan.1931 to Mongolata Block 8 GM Co.1934 let on tribute.Liquidated & acquired by Byles Mongolata.36W
Mongolata CentralMongolata No. 1 Alluvial1933-3740 t 16 cwt7 oz 12 dwt 1 gr£27-17-9 N£6-12-5 P100’ shaft, adit, winze & drives etc.Mongolata Central GM Syndicate did much unsuccessful exploration. Relationship with Mongolata No. 1 Alluvial unclear from notes.23N
Mongolata No. 31931 for several years29 t 5 cwt56 oz 18 dwt 1 grN/A70’ shaft with stopesWorked by K. & N. James36W
Mongolata No. 6Johnston’s Claim1931, abandoned by 19321 t 9 cwt1 oz 1 dwt 12 grN/AN/AN/AN/A
Mongolata NorthReynold’s Claim193362 t15 oz 18 dwt 13 grN/AAditWorked by Reynolds: unpayable.36W
Mongolata SouthD. Dunning’s Claim1934-3519423 t1 oz 5 dwt 12 grN/A40’ shaft with drives & crosscuts: short aditsA group of 6 claims by W. Pexton.South-east corner reworked by G. Dunning23S
A. Moore1931N/AN/AN/AUnderlie shaftValues low & erratic82
Mt Blanche193627 t 18 cwt12 oz 14 dwt 17 grN/AShaftWorked by Mt Blanche GM Syndicate76
Mt Edith1931-32N/AN/AN/AShaft1931 worked by A. McCallum1932 worked by J.H. HiddleAlso by Mt Edith GM Syndicate for poor results76
NewEnterprise1933-34N/AN/AN/AAdit with winze, shaft & shallow pits1933 worked by J. Broadbent1934 worked by New Enterprise GM SyndicateResults uneconomic.83
Newicke Ck1936N/AN/AN/AN/AName applied to a group of unsuccessful claims: e.g. see The Duffer & Par Lap137, 105, 100
North Star193667 t 7 cwt10 oz 10 dwt 8 grN/AN/A53W
Orinda J.H. Schwier’s Claim1931N/ASection 55 option assayed at 3 dwt/ton & 1.4% copperN/A16’ adit & costeen pitsOrinda Gm held an option over J.H. Schwier’s claim west of Byles’ on 36W and over part Section 55.Byles Mongolata took over the former.36W55
Par Lap1938-3919465t10 dwt 9 grN/AN/A1938-39 worked by G. Evans137
Pinaroo Syndicate1933-34N/AN/AN/A2 shafts: 2 aditsTraces of gold in thin veins only18N
Poverty Point1941-42N/AN/AN/AN/AOn site of previous operationsN/A
Price’s Claim1933N/AN/AN/A15’ aditWorked by J.R. Price with poor results42
G. ReidN/AN/AN/AN/AShallow pitsWorked by G.A. Reid with poor results41, 42
Retriever193548 t6 oz 14 dwt 15 grN/AMany short adits & shaftsConsiderable work for poor yields55
Rising Sun1932N/AA small amountN/AAdit & shaft1932 taken up by E.J. Harris & soon acquired by Byles Mongolata who developed it36W
Rosewall’s Claim1934-35N/AN/AN/A40’ AditWorked by J.A. Rosewall for very low gold values55
Salter & Hogan’sIron Battler1931-322 t 15 cwt6 oz 7 dwt 10 grN/AShallow shafts & trenchesSome good specimens, but no regular vein found36W
Salter’s Claim1933N/AN/AN/AOpen cutWorked by H. Slater for no results42
Scammell’s Alluvial1934-3525 t7 dwt 3 grN/A187’ shaftWorked by Scammell’s Alluvial GM Co.36E & 35
Seaton & Gregory1932-3375 t6 oz 16 dwt 12 grN/A128’ shaftSeaton & Gregory worked for alluvial, but results were poor63
Section 3019343 t 1 cwt2 oz 7 dwt 3 grN/AShallow workingsSeveral prospectors worked claims on section 30 in 193430
Section 55N/A5t 4 cwt2 oz 12 dwt 12 gr£9-13-7 NN/A55
Shipway & Evans1931-36N/AN/AN/A20’ shaft, open cut with driveSmall low grade veins82
TakatiFrom 1932, but irregular after 19361,017 t 2 cwt2,714 oz 4 dwt 19 gr£10,834-9-0 N£1,147-11-8 P80’ shaft, winze 50’ at bottom, other shafts crosscuts, drives etc.Pexton Bros took up the claim.Pexton’s Takati GM Co. was floated in 1933.Results good till 1936 then poor23N & 23S
Threadgold’s ClaimTakati South1930-3525 t1 0z 9 dwt 19 grN/AShort adit, shallow pits, 30’ underlie shaftThreadgold’s was a 1 acre claim on part of a closed road worked by Alfred Threadgold: unpayable.When called Takati South the map places it at a different location!18N23M
Wildildie1933-37291 t 15 cwt162 oz 3 dwt 2 grN/AMany shafts adits & drivesValues poor after an early rich patch23NM & 23N
G. Williams1934N/AN/AN/ASmall shaftUnpayable83
Wiltshire’s Claim1936N/AN/AN/AShallow workingsArea north of Mongolata North Mine: worked by Wiltshire & a mate: values low36