Mongolata Mines
Gold mine data for the Hundred of Mongolata.
| Name of Claim/Mine | Also Known As | Period Worked | OreProduced (In tons & hundredweights) | Gold Produced (In troy weight) | Value of Gold: N = Normal P = Premium | Method of Working | Comments | Section No. in Hundred of Mongloata |
|---|---|---|---|---|---|---|---|---|
| Anderson’s Reward | 1933 | 6 t 7 cwt | 2 oz 5 dwt 3 gr | N/A | Open cut 15’ x 10’ | Worked by R. Anderson | 4E | |
| Baldina | Baldina Mongolata GM Syndicate Mongolata No. 5 | 1932-45 | 578 t 16 cwt | 1,369 oz 18 dwt 15 gr | £5,512-0-11 N£6,022- 15-0 P | 3 main shafts, 30’ 90’, 100’, 2 undelie shafts, main adit 226’ | Many tributers also worked shallow shafts | 23M |
| Better ’Ole | 1932 | 1 t 12 cwt | 1 oz 13 dwt | £5-10-11 N£3-12-1 P | N/A | Absorbed into other leases | N/A | |
| Black Hills Claims | P. Oates ClaimA. Morrison Claim | 1932-34 | 11 t 5 cwt | 1 oz 3 dwt 11 gr | £4-8-6 N | Open cuts & drives | Yields very poor | 70 |
| Burra Mongolata Syndicate | J. Kellaway & Riggs Claim | 1931-33 | 6 t | 1 oz 15 dwt | £6-18-6 N | Adit & several shafts | 18N | |
| Byles Mongolata GM Co. | Mongolata GM Syndicate | Main effort 1930-35Minor effort 1945-52 | 3,549 t 17 cwt | 3,938 13 dwt 13 gr | N/A | Extensive, main shaft 341’, main adit at 92’ over 1,000’.Many shafts, drives, adits, crosscuts & stopes | Discovered Henry Byles, worked by Mpngolata GM Syndicate, reformed in 1932 as Byles Mongolata GM Co. | 36W |
| Caller Brae | Terry’s Mongolata No. 4 | 1940 | As Terry’s or Mongolata No. 4 1 t 10 cwtCaller Brae 64 t 3 cwt | 6 dwt 13 gr63 oz 0 dwt 21 gr | £241-3-7 N£1-11-1 P | 10’ shaft & adit | Worked by R. Anderson | 36W |
| Chalk Cliff Gold Prospecting | 1934 | N/A | N/A | N/A | N/A | N/A | ||
| Cunningham & Baillie | 1933 | N/A | N/A | N/A | N/A | Results unsatisfactory | 82 | |
| Curlew | 1930-45 & 1950 | 738 t 2 cwt | 1,817 oz 7 dwt 20 gr | £7,424-13-3 N | 2 long adits, 30’ shaft & many drives | H. Morgan made the claim in 1931, worked by Curlew GM Syndicate.1950 results poor | 36W& 23N | |
| D. Dillon | 1934 | 1 t 13 cwt | 3 oz 3dwt 10 gr | N/A | N/A | Worked by D. Dillon | N/A | |
| Donovan, Wills & McConnell | 1931-32 | N/A | N/A | N/A | Shallow shafts & adits | 55 | ||
| The Dope | 1936-37 | 57 t 1 cwt | 4 oz 4 dwt 22 gr | N/A | N/A | Worked by G. Evans | 98 | |
| Duffer | 1938 | 25 t 16 cwt | 11 dwt 10 gr | N/A | N/A | Worked by G. Evans | 105 | |
| East View | Rampton’s ClaimPart as Wally’s ClaimPart as Lucky Chance(N of Wally’s Hope) | 1930-4219461955 | 552 t 1 cwt15 t 9 cwtN/A | 573 oz 12 dwt 6 gr29 oz 17 dwt 8 grN/A | ┐£2,240-17-1 N┘£2,057-7-5 PN/A | Open cut, adits of 310’ & 67’ & 90’ shaft with drives & underlie shaft | 1946: Worked by W. Edwards1955: worked by F. Gerlan | 36W |
| Feltus’ Claim | 1933-34 | N/A | N/A | N/A | Shallow pits & open cut | Assayed up to 6 dwt/ton | 55 | |
| Fuss’ Claim | 1931 | N/A | N/A | N/A | Open cut & trenches | Worked by A. Fuss | 91 | |
| Gaghen’s Show | 1935 | N/A | N/A | N/A | Several shafts: deepest 30’, & drives | Worked by C. Gaghen & three others | 185 | |
| R. Garrard | 1932 | N/A | N/A | N/A | Shallow trenches | Worked by R. Garrard for alluvial, but poor results. | 25 | |
| Golden Eagle | 1933 | 15 t | 3 oz 9 dwt | N/A | Shaft to 25’ then on underlie | Worked by Trenwith & Lunnay: unpayable | 55 | |
| Golden Guinea | 1934 | 50 t | 12 oz 18 dwt 13 gr | N/A | 50’ shaft | Worked by L. & F. Fayers | 55 | |
| Golden Harp | As part of Byles Mongolata GM Co. | 1930-33From 1933 for several years | 1 t 3 cwt | 7 oz 11 dwt 2 gr | £29-0-7 N£45-17-0 P | 308’ adit & drive at 130’ | John Baker took the claim Dec. 1930: to Golden Harp GM Co. in 1931: unpayable.1933 to Byles Mongolata GM Co. who found payable gold. | 36W |
| Golden Speck | Northern Hope | 19341936 | 3 t 14 cwt5 t 12 cwt | 3 oz 7 dwt2 oz 5 dwt 9 gr | N/AN/A | ShaftsShafts | Dept. map shows these as the same. | 55 |
| Good Hope | 1934 | 28 t | 3 oz 3 dwt 15 gr | N/A | N/A | 59 & 60 | ||
| Hansel & Mundy | Terry’s ClaimPart reworked as Caller Brae | 1930-361940 | 62 t | 51 oz 7dwt 9 gr | N/A | 58’ shaft with crosscuts & drives | Taken Dec. 1930 by W. Terry.1931 Hansel Mundy worked an option.1932-36 worked on tribute.1940 see under Caller Brae. | 36W |
| King Francis | 1936-38 | 7 t | 2 oz 5 dwt 5 gr | N/A | Shaft | Worked by F. Riley for very poor results. | 36W | |
| Kooringa | N/A | 5 t 5 cwt | 7 dwt 9 gr | £1-5-6 N | N/A | N/A | ||
| F. Lewis | 1931 | No gold found | N/A | 42½’ shaft with E & W drives | Worked by F. Lewis | 36W | ||
| Lewis | 1931 | 3 t | 1 oz 5 dwt 12 gr | N/A | Open cut & adit | Worked by Lewis & party. | 23S | |
| Mongolata Alluvial | Mongolata No. 1 Alluvial, see alsoMongolata Central | 1932-33 | 15 t 18 cwt5 t | 13 dwt 17 gr2 oz 17 dwt 8 gr | £2-0-9 N£11-1-11 N | Shafts: deepest 187’ with 2 drives & winze | Worked by Mongolata Alluvial GM Co. | 23N |
| Mongolata Block 8 | Flaherty, Bevan & Morgan’s Claim | 1930-34 | 72 t 12 cwt | 145 oz 6 dwt 12 gr | £572-3-10 N | Adits & open cuts | Dec. 1930 claim of Flaherty, Bevan & Morgan.1931 to Mongolata Block 8 GM Co.1934 let on tribute.Liquidated & acquired by Byles Mongolata. | 36W |
| Mongolata Central | Mongolata No. 1 Alluvial | 1933-37 | 40 t 16 cwt | 7 oz 12 dwt 1 gr | £27-17-9 N£6-12-5 P | 100’ shaft, adit, winze & drives etc. | Mongolata Central GM Syndicate did much unsuccessful exploration. Relationship with Mongolata No. 1 Alluvial unclear from notes. | 23N |
| Mongolata No. 3 | 1931 for several years | 29 t 5 cwt | 56 oz 18 dwt 1 gr | N/A | 70’ shaft with stopes | Worked by K. & N. James | 36W | |
| Mongolata No. 6 | Johnston’s Claim | 1931, abandoned by 1932 | 1 t 9 cwt | 1 oz 1 dwt 12 gr | N/A | N/A | N/A | N/A |
| Mongolata North | Reynold’s Claim | 1933 | 62 t | 15 oz 18 dwt 13 gr | N/A | Adit | Worked by Reynolds: unpayable. | 36W |
| Mongolata South | D. Dunning’s Claim | 1934-351942 | 3 t | 1 oz 5 dwt 12 gr | N/A | 40’ shaft with drives & crosscuts: short adits | A group of 6 claims by W. Pexton.South-east corner reworked by G. Dunning | 23S |
| A. Moore | 1931 | N/A | N/A | N/A | Underlie shaft | Values low & erratic | 82 | |
| Mt Blanche | 1936 | 27 t 18 cwt | 12 oz 14 dwt 17 gr | N/A | Shaft | Worked by Mt Blanche GM Syndicate | 76 | |
| Mt Edith | 1931-32 | N/A | N/A | N/A | Shaft | 1931 worked by A. McCallum1932 worked by J.H. HiddleAlso by Mt Edith GM Syndicate for poor results | 76 | |
| NewEnterprise | 1933-34 | N/A | N/A | N/A | Adit with winze, shaft & shallow pits | 1933 worked by J. Broadbent1934 worked by New Enterprise GM SyndicateResults uneconomic. | 83 | |
| Newicke Ck | 1936 | N/A | N/A | N/A | N/A | Name applied to a group of unsuccessful claims: e.g. see The Duffer & Par Lap | 137, 105, 100 | |
| North Star | 1936 | 67 t 7 cwt | 10 oz 10 dwt 8 gr | N/A | N/A | 53W | ||
| Orinda | J.H. Schwier’s Claim | 1931 | N/A | Section 55 option assayed at 3 dwt/ton & 1.4% copper | N/A | 16’ adit & costeen pits | Orinda Gm held an option over J.H. Schwier’s claim west of Byles’ on 36W and over part Section 55.Byles Mongolata took over the former. | 36W55 |
| Par Lap | 1938-391946 | 5t | 10 dwt 9 gr | N/A | N/A | 1938-39 worked by G. Evans | 137 | |
| Pinaroo Syndicate | 1933-34 | N/A | N/A | N/A | 2 shafts: 2 adits | Traces of gold in thin veins only | 18N | |
| Poverty Point | 1941-42 | N/A | N/A | N/A | N/A | On site of previous operations | N/A | |
| Price’s Claim | 1933 | N/A | N/A | N/A | 15’ adit | Worked by J.R. Price with poor results | 42 | |
| G. Reid | N/A | N/A | N/A | N/A | Shallow pits | Worked by G.A. Reid with poor results | 41, 42 | |
| Retriever | 1935 | 48 t | 6 oz 14 dwt 15 gr | N/A | Many short adits & shafts | Considerable work for poor yields | 55 | |
| Rising Sun | 1932 | N/A | A small amount | N/A | Adit & shaft | 1932 taken up by E.J. Harris & soon acquired by Byles Mongolata who developed it | 36W | |
| Rosewall’s Claim | 1934-35 | N/A | N/A | N/A | 40’ Adit | Worked by J.A. Rosewall for very low gold values | 55 | |
| Salter & Hogan’s | Iron Battler | 1931-32 | 2 t 15 cwt | 6 oz 7 dwt 10 gr | N/A | Shallow shafts & trenches | Some good specimens, but no regular vein found | 36W |
| Salter’s Claim | 1933 | N/A | N/A | N/A | Open cut | Worked by H. Slater for no results | 42 | |
| Scammell’s Alluvial | 1934-35 | 25 t | 7 dwt 3 gr | N/A | 187’ shaft | Worked by Scammell’s Alluvial GM Co. | 36E & 35 | |
| Seaton & Gregory | 1932-33 | 75 t | 6 oz 16 dwt 12 gr | N/A | 128’ shaft | Seaton & Gregory worked for alluvial, but results were poor | 63 | |
| Section 30 | 1934 | 3 t 1 cwt | 2 oz 7 dwt 3 gr | N/A | Shallow workings | Several prospectors worked claims on section 30 in 1934 | 30 | |
| Section 55 | N/A | 5t 4 cwt | 2 oz 12 dwt 12 gr | £9-13-7 N | N/A | 55 | ||
| Shipway & Evans | 1931-36 | N/A | N/A | N/A | 20’ shaft, open cut with drive | Small low grade veins | 82 | |
| Takati | From 1932, but irregular after 1936 | 1,017 t 2 cwt | 2,714 oz 4 dwt 19 gr | £10,834-9-0 N£1,147-11-8 P | 80’ shaft, winze 50’ at bottom, other shafts crosscuts, drives etc. | Pexton Bros took up the claim.Pexton’s Takati GM Co. was floated in 1933.Results good till 1936 then poor | 23N & 23S | |
| Threadgold’s Claim | Takati South | 1930-35 | 25 t | 1 0z 9 dwt 19 gr | N/A | Short adit, shallow pits, 30’ underlie shaft | Threadgold’s was a 1 acre claim on part of a closed road worked by Alfred Threadgold: unpayable.When called Takati South the map places it at a different location! | 18N23M |
| Wildildie | 1933-37 | 291 t 15 cwt | 162 oz 3 dwt 2 gr | N/A | Many shafts adits & drives | Values poor after an early rich patch | 23NM & 23N | |
| G. Williams | 1934 | N/A | N/A | N/A | Small shaft | Unpayable | 83 | |
| Wiltshire’s Claim | 1936 | N/A | N/A | N/A | Shallow workings | Area north of Mongolata North Mine: worked by Wiltshire & a mate: values low | 36 |